What does the report actually certify?
Nothing, in the sense people hope for. It records visible evidence of wood-destroying insects and decay fungus found on one date, within a stated scope, and names what was not reachable. It is not a guarantee about the structure and it is not a statement about anything hidden behind finish work.
That limitation is the reason the inaccessible-areas list exists. An inspector can only report what was visible on the day, and a great deal of a house is not visible: the inside of walls, the underside of a slab, framing above a sealed ceiling, the perimeter behind a deck. A report that pretends otherwise is less useful than one that is specific about its own blind spots.
Read the right way, it is still a strong document. A dated record of no visible evidence, a clear list of conducive conditions, and an explicit statement of what was not reached gives a buyer something to act on and the next inspector something to compare against. Read the wrong way, as a clean bill of health, it does nobody any favors.
Why does old damage cause so much argument?
Because a gallery in a joist is permanent, so it keeps appearing on every report for the life of the building, and nothing about its appearance states when it was made. Separating old damage from active work is the judgment the whole transaction turns on, and it is the question to ask directly.
Active workings tend to be damp, packed with soil and occupied; old galleries are usually dry, empty, and often painted or patched over from a repair. Mud tubing that is rebuilt within days of being broken is a live route; tubing that crumbles and is never repaired is a record. An inspector uses those distinctions rather than the extent of the damage, which says nothing about timing.
Where the visible evidence genuinely will not settle it, the form should say so and the next step is more inspection rather than a stronger adjective. Previous treatment evidence, such as drill holes along a slab edge, is worth noting for the same reason: it tells the reader the building has a history, which changes how the rest of the findings read.
What should I do before the inspector arrives?
Make the building reachable. Clear the crawl-space hatch and a route through it, move stored material off the sill and away from the walls, pull the woodpile back from the siding, and open access to the garage junction and the water heater closet. Every area cleared is an unknown converted into a finding.
This is the single most useful hour anyone spends on the process, and sellers routinely skip it. A crawl space stacked with boxes, a perimeter buried behind a deck skirt and a raised bed, and an attic with no safe footing between the hatch and the eaves all end up on the form as areas not inspected. Those lines then become the ones the buyer asks about.
A couple of other small things help. Note where swarmers were seen and when, and keep any specimens or shed wings rather than vacuuming them away. If the house has been treated before, find whatever record exists. None of that changes the findings, but it changes how quickly the inspector can get to them and how much of the building ends up in the report rather than in the exclusions.
What moves the price of a report up or down?
The size and construction of the building, whether there is a crawl space and how accessible it is, how many structures are included, how much of the perimeter is reachable, and whether a deadline requires work outside an ordinary sequence. No figure appears on this page. The price is explained and approved before the work starts.
Access and scope do nearly all of it. A house with an open perimeter and a crawl space you can move around in is a predictable job; a lake property with a house, a detached garage and a boathouse, a crawl space entered through a cabinet, and a shoreline elevation behind a deck is several times the work. Each additional building is its own inspection and its own section on the form.
Construction type matters too. A pier structure exposes the critical wood and reads quickly; a slab hides it, so the inspection relies on sounding, probing and the perimeter, which takes longer for the same square footage. A technician sees the property, says what is included and what is not reachable, and gets it approved first. The cost guide explains the drivers.
Who may write one in Oklahoma?
The work sits in the structural category, 7B, which covers termites and other wood-destroying organisms in or on a structure, including wood borers and fungus. Licensing runs through the Oklahoma Department of Agriculture, Food and Forestry, and ODAFF is the office to ask what a category covers.
A practical exam is required for the structural, general pest and fumigation categories, held at Oklahoma State University in Stillwater, and the categories are not interchangeable: 7A is general pest and 7C is fumigation. A buyer or a seller can ask which category the inspector holds, and it is a reasonable question rather than an awkward one.
What is not published in a usable form is anything about a pre-sale requirement, a mandatory contract for termite work, or paperwork obligations beyond the license itself, so this page makes no claim about any of them. Questions of that kind belong with ODAFF's pesticide program. The guide to hiring a licensed applicator sets out what to ask.